This plant’s boiler was load-limited and could not sustain full load operations. Midwesco/TDC through it's Thermo+Plus® Pleated Elements were able to increase capacity to maximum output. Problem: This plant’s boiler was load-limited and could not sustain full load operations. They were baghouse-limited, running at +8” delta P and could not maximize the boiler operations due to the limited baghouse flows. Solution: Midwesco introduced Thermo+Plus® pleated elements, using PPS media with ePTFE membrane. We also provided upgraded Mecair® high-capacity pulse valves that increased the cleaning capacity by more than 47%. Midwesco provided turn-key service, including product, installation, and start-up assistance. Results: The boiler can now operate at its maximum output with lower cost-per-cfm at the baghouse. The plant now operates at full load boiler capacity. |